Tuesday, November 22, 2011

Tepco Fukushima Video Catalog Page of new videos not yet released


Organizing videos that had been taken from March 11 to September 30 except those already posted.

file nametime
(min, sec)
date and time of recording
outside damage by Tsunami of Unit 5 and 6 1 20:36May 26, 2011
Installation status of secondary piping of spent fuel pool alternative cooling system 1 / 2 / 37:06August 10, 2011
motion picture about the change of injection point of Unit 3 reactor19:10August 23, 2011
field inspection of core spray injection on Unit 211:26September 2, 2011
water discharge work in Unit 4 spent fuel pool2:10March 24, 2011
status check and water discharge work in Unit 3 spent fuel pool 1 / 251:24April 18, 2011
Installation work of water level gauge for thermocouple in Unit 4 spent fuel pool0:47April 28, 2011
water level measurement work in Unit 4 spent fuel pool 14:10April 29, 2011
water level measurement work in Unit 4 spent fuel pool 28:22April 30, 2011
water level measurement work in Unit 4 spent fuel pool 315:16May 1, 2011
water sampling work in Unit 4 spent fuel pool19:31May 2, 2011
water level measurement work in Unit 4 spent fuel pool 412:35May 3, 2011
water level measurement work in Unit 4 spent fuel pool 517:59May 4, 2011
Installation work of water level gauge for thermocouple in Unit 4 spent fuel pool 24:55May 6, 2011
status of Unit 4 operating floor including spent fuel pool 1 / 2351:31May 7, 2011
status of Unit 4 operating floor including spent fuel pool10:46May 15, 2011
status of Unit 1 operating floor including spent fuel pool 1 / 2345:03May 16, 2011
water discharge work on debris on Unit 1 operationg floor3:26May 20, 2011
spray work of dust inhibitor on Unit 1 R/B operating floor and on the wall10:01June 8, 2011
spray work of dust inhibitor on Unit 3 R/B operating floor and on the wall20:00June 9, 2011
status of water leakage on pure water tank No.2 1 / 20:56April 2, 2011
status of water leakage on pure water tank No.2 3 / 40:54April 3, 2011
status of water leakage on pure water tank No.30:44April 20, 2011
status of water leakage on pure water tank No.21:07April 29, 2011
status of water leakage on pure water tank No.2 1 / 21:21April 30, 2011
status of water leakage on pure water tank No.30:48April 30, 2011
water leakage in Unit 6 emergency electrical equipment room 123:02April 16, 2011
water leakage on the wall of Unit 6 emergency electrical equipment room0:28April 16, 2011
clack and water leakage on the wall of Unit 6 residual heat removal system room (A)1:27April 17, 2011
puddle in Unit 6 extubation area 1 / 21:52April 24, 2011
status of inflow in Unit 5 CS (B) room1:59April 28, 2011
storm funnel on the 2nd floor of Unit 5 T/B 1 / 20:59May 10, 2011
accumulated water at Unit 6 high pressure core spray system diesel generator trench1:02May 10, 2011
accumulated water at Unit 6 reactor core isolation cooling system room0:34May 10, 2011
accumulated water at the front of Unit 6 residual heat removal system room (A) room1:15May 10, 2011
status of underground water inflow at path-through slot of Unit 5 CS (B) pump room0:54June 4, 2011
sea water hose of Unit 5 temporary residual heat removal system1:24June 8, 2011
water flood on the underground floor of Unit 6 T/B between TB and MC1:05July 8, 2011
water flood on the underground floor of Unit 6 T/B "Bamboo Corridor"0:18July 8, 2011
water flood at Unit 6 heater drain pump --- switchgear room 120:46July 9, 2011
in front of Unit 3,4 S/B underground floor cable bolt room 10:30August 4, 2011
in front of Unit 3,4 S/B underground floor cable bolt room 2 /30:43August 6, 2011
water leakage point in Unit 3,4 S/B underground floor cable bolt room0:40August 5, 2011
water flood in Unit 6 switchgear room 1 / 2 / 3 / 4 / 5 / 61:28August 16, 2011
underground water inflow at Unit 6 RW trench 1 / 2 / 3 / 4 / 56 / 73:06August 27, 2011
Unit 6 leakage filter sludge tank room passage in the trench just   ,  in the trench  ,  near the trench2:47August 30, 2011
leakage of trench rubber boots of high pressure core spray system diesel generator room 1 / 2 / 34:35September 2, 2011
after alarm of leakage annunciator (alarm indicator) of trench rubber boots of high pressure core spray system diesel generator room 1 / 2 / 31:13September 3, 2011
typhoon No.15
cable tray in the south side of Unit 5 high pressure condensed water pump (C)0:39September 21, 2011
the back of Unit 5 (Primary Containment Vessel) air conditioner 5-30A0:42September 21, 2011
Unit 6 emergency switchgear (5)0:17September 21, 2011
Unit 6 emergency switchgear room at 22:000:42September 21, 2011
Unit 6 emergency switchgear room at 23:000:37September 21, 2011
Unit 6 access way between switchgear and T/B1:41September 22, 2011
dripping status at Unit 6 turbine operating floor 1 / 20:43September 22, 2011
water flood on Unit 6 condensed water demineraliser regenerator room 1 / 2 / 3 / 41:17September 22, 2011
rubber boots on Unit 6 condensed water demineraliser regenerator room0:40September 22, 2011
water leakage at Unit 6 Tb --- switchgear room 1 / 22:42September 22, 2011
Unit 5 high pressure condensed water pump hill side 1 / 20:36September 22, 2011
around lavatory on the underground of Unit 5 T/B0:09September 22, 2011
Unit 5 house transformer room south hill side0:20September 22, 2011
wate leakage on Unit 6 switchgear room0:19September 22, 2011
water leakage status of Unit 6 waste exhauster (A)0:26September 26, 2011

No comments:

Post a Comment